Apply: Egbin PowerUp Internship Programme 2025

Egbin Power Plc

Apply: Egbin PowerUp Internship Programme 2025

About Egbin Power Plc

Egbin Power Plc, located in Lagos, is one of Nigeria’s largest electricity-generating plants and is often regarded as the largest single power station in Sub-Saharan Africa. Originally built to address the growing electricity demands in Lagos and surrounding areas, the plant has an installed capacity of 1,320 MW. Following Nigeria’s privatization initiative, Sahara Power Group, a subsidiary of Sahara, acquired the plant. Sahara Power aims to increase its generation capacity to at least 5,000 MW within the next five years.

Summary

  • Company: Egbin Power Plc
  • Job Title: Egbin PowerUp Internship Programme 2025 (Second Half)
  • Job Type: Full Time
  • Qualification: BA/BSc/HND
  • Location: Nigeria
  • Deadline: 10th June, 2025

Job Title: Egbin PowerUp Internship Programme 2025 (Second Half)

Description

  • Egbin PowerUp Internship Experience equips students to bridge the gap between theoretical knowledge and practical application, also enhancing their skills, building their confidence, and sharpening their creativity and problem-solving abilities.
  • This Internship runs from July – December 2025.

Field of Study:

  • Engineering
  • Chemistry
  • Computer Science

Eligibility

  • Students on Second Class Upper (2:1) or its equivalent as at the time of submitting the application.

Click here to get a professional, ATS compliant CV from an Expert for less than 5k.

Method of Application

(See tips on how to write a professional CV, ATS Compliant CV and a sample cover letter.)

Important: See Helpful Career Resources


Discover more from Tech School Info

Subscribe to get the latest posts sent to your email.